ACTION A01.- Preparation of a plot to create a pedestrian access route to Verdicio Beach
Action
A01. RESTORATION OF THE DUNE ECOSYSTEM ON THE BEACHES OF THE LUANCO – CABO PEÑAS ECOLOGICAL CORRIDOR.
Programme axis
1. Green and Sustainable Transition
The plot had become environmentally degraded because it was being used as an uncontrolled, unregulated parking area. This was having a significant negative impact on the fragile dune ecosystem, causing soil erosion and uncontrolled runoff. There was also no safety at all for vehicles or for pedestrians walking to the beach, and the site was not accessible.
The aim of the action is to create a pedestrian access route to Verdicio Beach that guides users and keeps them from walking across the dune. Better management of visitor flows will prevent damage to the natural area, and in particular to the dune system.
The design of the pedestrian route and the location of the lifeguard hut are used to organise and limit vehicle access to the plot. This respects the boundary of the Maritime-Terrestrial Public Domain and the right of way, and protects the area from misuse.
The action has restored the plot’s natural environment. Uncontrolled parking was stopped by fencing off the area with natural boundaries, and the habitat was restored. At the same time, a safe pedestrian route that blends into the landscape has been created, channelling visitors towards the beach while protecting the natural surroundings. Paved, properly signposted parking spaces reserved exclusively for people with reduced mobility (PRM) have also been provided.
A01.1.—Design, Project Management, and Health Services Coordination for the “Site Preparation for the Creation of a Pedestrian Path to Verdicio Beach”
- Procurement file: CON/2025/6
- Public tender on the Spanish Public Sector Procurement Platform: https://contrataciondelestado.es/wps/poc?uri=deeplink:detalle_licitacion&idEvl=zqtWndwEFwLs%2BnLj3vAg5A%3D%3D
- Contract Awarded to: SOCIEDAD DE PROYECTOS HEVIA S.L.
- Contract award amount: €10,890.00
- Execution period: 40 days (project delivery)
- Work status: completed
A01.2.- Works for the “Preparation of a plot to create a pedestrian route to Verdicio Beach”
- Procurement file: CON/2024/86
- Public tender on the Spanish Public Sector Procurement Platform: https://contrataciondelestado.es/wps/poc?uri=deeplink:detalle_licitacion&idEvl=XkFdhl6QLRGcTfjQf3USOg%3D%3D
- Awarded to: EXCAVACIONES ALLENDE Y JARDINOR S.L.
- Execution amount: €90,226.94
- Project duration: 3 months
- Work status: completed